Projects

MC MILLAN
The McMillan Community Center, located in the northwest quadrant of Washington, DC, was completed in 2022. The general contractor for this project was Gilbane. The new McMillan Community Center has 12,000 square feet of SOG and 8,000 square feet of structural slab, providing more than enough for entertainment programming. On this project LA Howard Construction poured over 2,200 CY of concrete in addition to concrete walls, retaining walls, grade beams, pool foundations and stairs on grade.

Crawford Gardens
Crawford Gardens, located in the northeast quadrant of Washington, DC, was completed in 2024. The general contractor for this project was Bozzuto Construction. Crawford Gardens has 8,759 square feet of SOG and 12,086 square feet of Structural slab. On this project LA Howard Construction poured over 2,000 CY of concrete in addition to concrete walls, frame stairs, concrete columns, elevator pits, shear walls, etc.

Barry Farm 1A
Located in the Southeast quadrant of Washington, D.C., Barry Farm 1A is part of the larger Barry Farm redevelopment initiative. Hamel Builders as the general contractor.
LA Howard Construction was responsible for major concrete operations on this site, placing over 4,477 cubic yards of concrete. The scope included approximately 58,271 square feet of slab on grade (1,106 CY) and 86,710 square feet of framed structural slab (3,371 CY).
The project also involved concrete walls, grade beams, columns, retaining structures, and other vertical and horizontal concrete elements. Due to site conditions and structural demands, a mobile crane was utilized to support formwork and material placement throughout various phases of the project.
This work exemplifies our ability to manage and execute large-scale, technically demanding concrete packages with precision and efficiency.

BARRY FARM 1B
Located in the Southeast quadrant of Washington, D.C., Barry Farm 1B was successfully completed in 2024, with Hamel Builders serving as the general contractor.
As part of this large-scale redevelopment, LA Howard Construction Co. executed extensive concrete work, including over 1,296 cubic yards of concrete placed across various structural elements. Our scope included approximately 17,918 square feet of slab on grade (305 CY) and 20,465 square feet of framed structural slab (991 CY).
Additional work included concrete walls, grade beams, retaining wall footings, concrete columns, drop panels, shear walls, planter walls, topping slabs, and site concrete.
This project demonstrates our expertise in delivering high-volume, high-quality concrete solutions for complex urban developments.

Leckie Elementary School
LA Howard Construction is proud to contribute to the expansion of Leckie Elementary School, supporting the advancement of quality education through the construction of a modern and resilient new addition.
Concrete placement for pile caps, grade beams, structural slabs, walls, footings, ramps, and stairs. The project features approximately 10,334 square feet of slab on grade (SOG) and 16,800 square feet of slab on metal deck, totaling an estimated 1,100 cubic yards of concrete placed.
This project highlights our ongoing commitment to precision, safety, and high-quality workmanship in educational facility construction.