Est. 1993

Strong Relationships
BUILT ON QUALITY CONSTRUCTION

The nation's trusted structural and site concrete contractor — delivering federal, commercial, residential and institutional projects with three decades of craftsmanship.

L. A. Howard Construction Company

L. A. Howard Construction Company

Washington, DC

30+
Years in Business
200+
Projects Delivered
60+
Combined Mgmt. Yrs

Featured Project

Built to a higher standard.

Barry Farm 1A.

Dedicated crew for each project. The crews can handle up to 100,000 square footage.

Barry Farm 1A — Multi-family construction, Washington DC (view 1 of 3)Barry Farm 1A — Multi-family construction, Washington DC (view 2 of 3)Barry Farm 1A — Multi-family construction, Washington DC (view 3 of 3)
View 1 / 3

A 139-unit, mixed-use affordable housing building in Southeast Washington, D.C. Part of the neighborhood's massive revitalization, it features six stories and includes over 27,000 square feet of retail space.

MIXED-USE RESIDENTIAL

Barry Farm 1A

Washington, DC

Scope

Structural Concrete

Size

Multi-Building

Year

2024

Barry Farm 1A, view 1 of 3

L. A. Howard At Work

Field progress across active concrete work.

Crawford Gardens — dense reinforcing steel prepared for a large structural slab pour with placing boom overhead.

Crawford Gardens

Crawford Gardens

Crawford Gardens, located in the northeast quadrant of Washington, DC, was completed in 2024. The general contractor for this project was Bozzuto Construction. Crawford Gardens has 8,759 square feet of SOG and 12,086 square feet of Structural slab. On this project L. A. Howard Construction poured over 2,000 CY of concrete in addition to concrete walls, frame stairs, concrete columns, elevator pits, shear walls, etc.

Crawford Gardens — formed concrete columns under construction with bracing and crew access in place.

Crawford Gardens

Crawford Gardens

Crawford Gardens, located in the northeast quadrant of Washington, DC, was completed in 2024. The general contractor for this project was Bozzuto Construction. Crawford Gardens has 8,759 square feet of SOG and 12,086 square feet of Structural slab. On this project L. A. Howard Construction poured over 2,000 CY of concrete in addition to concrete walls, frame stairs, concrete columns, elevator pits, shear walls, etc.

Crawford Gardens — site concrete pour underway with finishing crew shaping a reinforced pad at street level.

Crawford Gardens

Crawford Gardens

Crawford Gardens, located in the northeast quadrant of Washington, DC, was completed in 2024. The general contractor for this project was Bozzuto Construction. Crawford Gardens has 8,759 square feet of SOG and 12,086 square feet of Structural slab. On this project L. A. Howard Construction poured over 2,000 CY of concrete in addition to concrete walls, frame stairs, concrete columns, elevator pits, shear walls, etc.

Crawford Gardens — concrete foundation work with equipment and crew supporting a structural pour.

Crawford Gardens

Crawford Gardens

Crawford Gardens, located in the northeast quadrant of Washington, DC, was completed in 2024. The general contractor for this project was Bozzuto Construction. Crawford Gardens has 8,759 square feet of SOG and 12,086 square feet of Structural slab. On this project L. A. Howard Construction poured over 2,000 CY of concrete in addition to concrete walls, frame stairs, concrete columns, elevator pits, shear walls, etc.

Barry Farm 1A — fresh structural slab placement in progress with crews working around column reinforcing steel.

Barry Farm 1A

Barry Farm 1A

Located in the Southeast quadrant of Washington, D.C., Barry Farm 1A is part of the larger Barry Farm redevelopment initiative. Hamel Builders as the general contractor.

L. A. Howard Construction was responsible for major concrete operations on this site, placing over 4,477 cubic yards of concrete. The scope included approximately 58,271 square feet of slab on grade (1,106 CY) and 86,710 square feet of framed structural slab (3,371 CY).

The project also involved concrete walls, grade beams, columns, retaining structures, and other vertical and horizontal concrete elements. Due to site conditions and structural demands, a mobile crane was utilized to support formwork and material placement throughout various phases of the project.

This work exemplifies our ability to manage and execute large-scale, technically demanding concrete packages with precision and efficiency.

Barry Farm 1A — mixed-use affordable housing construction progress in Southeast Washington, D.C.

Barry Farm 1A

Barry Farm 1A

Located in the Southeast quadrant of Washington, D.C., Barry Farm 1A is part of the larger Barry Farm redevelopment initiative. Hamel Builders as the general contractor.

L. A. Howard Construction was responsible for major concrete operations on this site, placing over 4,477 cubic yards of concrete. The scope included approximately 58,271 square feet of slab on grade (1,106 CY) and 86,710 square feet of framed structural slab (3,371 CY).

The project also involved concrete walls, grade beams, columns, retaining structures, and other vertical and horizontal concrete elements. Due to site conditions and structural demands, a mobile crane was utilized to support formwork and material placement throughout various phases of the project.

This work exemplifies our ability to manage and execute large-scale, technically demanding concrete packages with precision and efficiency.

Barry Farm 1A — crew members finishing concrete stairs on grade with formwork and reinforcing in place.

Barry Farm 1A

Barry Farm 1A

Located in the Southeast quadrant of Washington, D.C., Barry Farm 1A is part of the larger Barry Farm redevelopment initiative. Hamel Builders as the general contractor.

L. A. Howard Construction was responsible for major concrete operations on this site, placing over 4,477 cubic yards of concrete. The scope included approximately 58,271 square feet of slab on grade (1,106 CY) and 86,710 square feet of framed structural slab (3,371 CY).

The project also involved concrete walls, grade beams, columns, retaining structures, and other vertical and horizontal concrete elements. Due to site conditions and structural demands, a mobile crane was utilized to support formwork and material placement throughout various phases of the project.

This work exemplifies our ability to manage and execute large-scale, technically demanding concrete packages with precision and efficiency.

McMillan Community Center — completed plaza with patterned paving, cone towers, and integrated landscape features.

McMillan

McMillan

The McMillan Community Center, located in the northwest quadrant of Washington, DC, was completed in 2022. The general contractor for this project was Gilbane. The new McMillan Community Center has 12,000 square feet of SOG and 8,000 square feet of structural slab, providing more than enough for entertainment programming. On this project L. A. Howard Construction poured over 2,200 CY of concrete in addition to concrete walls, retaining walls, grade beams, pool foundations and stairs on grade.

McMillan Community Center — exterior of the glass-enclosed community center building with steel canopy.

McMillan

McMillan

The McMillan Community Center, located in the northwest quadrant of Washington, DC, was completed in 2022. The general contractor for this project was Gilbane. The new McMillan Community Center has 12,000 square feet of SOG and 8,000 square feet of structural slab, providing more than enough for entertainment programming. On this project L. A. Howard Construction poured over 2,200 CY of concrete in addition to concrete walls, retaining walls, grade beams, pool foundations and stairs on grade.

McMillan Community Center — crew placing and finishing concrete on formed stairs on grade.

McMillan

McMillan

The McMillan Community Center, located in the northwest quadrant of Washington, DC, was completed in 2022. The general contractor for this project was Gilbane. The new McMillan Community Center has 12,000 square feet of SOG and 8,000 square feet of structural slab, providing more than enough for entertainment programming. On this project L. A. Howard Construction poured over 2,200 CY of concrete in addition to concrete walls, retaining walls, grade beams, pool foundations and stairs on grade.

McMillan Community Center — finished plaza paving with arched pedestrian bridge in the background.

McMillan

McMillan

The McMillan Community Center, located in the northwest quadrant of Washington, DC, was completed in 2022. The general contractor for this project was Gilbane. The new McMillan Community Center has 12,000 square feet of SOG and 8,000 square feet of structural slab, providing more than enough for entertainment programming. On this project L. A. Howard Construction poured over 2,200 CY of concrete in addition to concrete walls, retaining walls, grade beams, pool foundations and stairs on grade.

Leckie Elementary School — freshly poured slab on grade with perimeter formwork and column dowels in place.

Leckie Elementary School

Leckie Elementary School

L. A. Howard Construction is proud to contribute to the expansion of Leckie Elementary School, supporting the advancement of quality education through the construction of a modern and resilient new addition.

Concrete placement for pile caps, grade beams, structural slabs, walls, footings, ramps, and stairs. The project features approximately 10,334 square feet of slab on grade (SOG) and 16,800 square feet of slab on metal deck, totaling an estimated 1,100 cubic yards of concrete placed.

This project highlights our ongoing commitment to precision, safety, and high-quality workmanship in educational facility construction.

Leckie Elementary School — dense rebar mat and formwork prepared for structural slab placement.

Leckie Elementary School

Leckie Elementary School

L. A. Howard Construction is proud to contribute to the expansion of Leckie Elementary School, supporting the advancement of quality education through the construction of a modern and resilient new addition.

Concrete placement for pile caps, grade beams, structural slabs, walls, footings, ramps, and stairs. The project features approximately 10,334 square feet of slab on grade (SOG) and 16,800 square feet of slab on metal deck, totaling an estimated 1,100 cubic yards of concrete placed.

This project highlights our ongoing commitment to precision, safety, and high-quality workmanship in educational facility construction.

01 / 13

Award & Recognition

Washington Building Congress Craftsmanship Award

Awarded for the historic Howard Theatre Restoration Project.